Summary of 6th Street Building Improvements
The building on 6th Street has received comprehensive updates focused on structural integrity, energy efficiency, and modern amenities. Key improvements include:
- Roof: Completely redone and coated in 2025, backed by a 10-year no-leak guarantee.
- Electrical System: Fully updated throughout the entire building (no specific year provided).
- Plumbing System: Completely updated across the building (no specific year provided).
- Boiler: Totally rebuilt in 2025.
- Windows: All replaced with Thermopane energy-efficient models, except for the front glass in the retail shop (no specific year provided).
- Front Doors: All replaced in 2024.
- Door Locks: Electronic locks installed throughout the building, supporting combo or card swipe access (no specific year provided).
- Air Conditioning: Two AC units newly installed in 2025; the remaining units are 3-5 years old as of 2024.