From: Ashley Lehman <ashley.lehman@topekapartnership.com>
Sent: Thursday, 17 September 2026 08:27:00
Cc: Ashley Lehman <ashley.lehman@topekapartnership.com>
Subject: Project Paws - Real Estate Inquiry
Sent: Thursday, 17 September 2026 08:27:00
Cc: Ashley Lehman <ashley.lehman@topekapartnership.com>
Subject: Project Paws - Real Estate Inquiry
Hello,
The Kansas Department of Commerce is working directly with a company that would like to review real estate options for a possible production/R&D/sales/distribution facility. At this time, they are only interested in existing facility to purchase, not lease.
Timeline: As soon as possible. Within 3 months. Operational 10+ months after purchase.
Can you please review the criteria below and share any possible buildings that match the requirements by September 23rd.
Minimum Site Requirements:
- EXISTING BUILDINGS FOR SALE with a target between 79k-87k sq ft. Comparable larger facilities may also be considered. (7-20 acres preferred)
- Minimum 30 ft clear height.
- Loading: 5 truck loading positions /dock-high doors; Facility must accommodate 53-ft semi-trailers.
- Heavy duty industrial slab suitable for cold storage and food processing equipment. Targeting approximately 8-10” concrete where applicable and floor load around 1000 psf.
- Large trucks must be able to enter, maneuver, load/unload, and exit without operational restrictions.
- Preferably within 5 miles of an interstate highway with 24/7 heavy-truck traffic permitted.
- Prefers Kansas City metro, but may review other options especially if within a 1-hour drive to an airport.
- Rail is preferred, but not mandatory.
Thank you,
Please take a survey and share your perspective about the future of Topeka, Shawnee County.
English: https://www.surveymonkey.com/r/GTStrategy
Spanish: El Plan Estratégico Comunitario de 5 Años para Topeka y el Condado de Shawnee
No comments:
Post a Comment